BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.32.0//EN
X-ORIGINAL-URL:https://fittietrust.org.uk/
X-WR-CALNAME:Fittie Community Development Trust
X-WR-CALDESC:A a charitable organisation set up by local residents to support the development of the community
X-WR-TIMEZONE:Europe/London
BEGIN:VTIMEZONE
TZID:Europe/London
X-LIC-LOCATION:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T020000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=-1SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=4SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-7876acb66640bad41f1e1371ef30c180@fittietrust.org.uk
DTSTART;TZID=Europe/London:20260219T150000
DTEND;TZID=Europe/London:20260219T190000
DTSTAMP:20260215T150303Z
CREATED:20260215
LAST-MODIFIED:20260216
PRIORITY:5
SEQUENCE:2
TRANSP:OPAQUE
SUMMARY:Public consultation – beach pipeline
DESCRIPTION:Aberdeen City Council is proposing to connect the Torry Heat Network to the Aberdeen and power City Centre and Seaton Heat Networks via a new pipeline that will transfer low-carbon heat from the Energy From waste facility at East Tullos into the existing heat networks. The scheme also includes a connection between Seaton and Tillydrone Heat Networks to pave the way for future network growth.  A section of the pipeline will be laid along the beach and around Fittie.\n \nThere will be a Public Information session held at Fittie Hall on Thursday 19th February. This will be open between 3pm and 7pm. All welcome.\n
URL:https://fittietrust.org.uk/events/public-consultation-beach-pipeline/
ATTACH;FMTTYPE=image/jpeg:https://fittietrust.org.uk/wp-content/uploads/2026/02/Pipeline-consultation-1.jpeg
END:VEVENT
END:VCALENDAR
