Public consultation – beach pipeline
Aberdeen City Council is proposing to connect the Torry Heat Network to the Aberdeen and power City Centre and Seaton Heat Networks via a new pipeline that will transfer low-carbon heat from the Energy From waste facility at East Tullos into the existing heat networks. The scheme also includes a connection between Seaton and Tillydrone Heat Networks to pave the way for future network growth. A section of the pipeline will be laid along the beach and around Fittie.
There will be a Public Information session held at Fittie Hall on Thursday 19th February. This will be open between 3pm and 7pm. All welcome.

